"Clashes" in drawings happen when two or more building components or systems are shown to occupy the same physical space. For example, a structural beam might be drawn where a large ventilation duct needs to pass, or a pipe might intersect with an electrical conduit.
How to Avoid:
How to Resolve:
Late drawing approvals or design changes can have a significant negative impact on a construction project's schedule and cost, creating a ripple effect across the entire project:
Impact on Schedule:
Impact on Cost:
To mitigate these impacts, proactive planning, clear communication, efficient review processes, and the use of digital tools are essential.
Building Information Modeling (BIM) significantly improves the drawing review and management process by shifting from 2D drawings to a collaborative 3D model-based approach:
A systematic approach to identifying and resolving inconsistencies (clashes) between architectural, structural, and MEP (Mechanical, Electrical, Plumbing) drawings is crucial for a smooth construction process. This often involves a multi-stage coordination process:
A robust document control system for drawings in a large-scale project is essential for efficiency, accuracy, and legal compliance. Its key elements include:
Ensuring subcontractors and suppliers use the correct and latest drawings is critical to avoid costly mistakes and delays. This requires a proactive and systematic approach: