Concrete Cube Casting & Storage SOP

Standard Operating Procedure for preparation, casting, curing, and storage of concrete cube samples for quality control testing as per IS 516:1959 and IS 456:2000 requirements for construction projects.

Duration: Variable based on testing schedule Team: QA/QC Engineer, Lab Technician Risk Level: Low

1. Purpose

To establish a standardized procedure for the preparation, casting, curing, and storage of concrete cube specimens for compressive strength testing, ensuring consistent testing results and compliance with IS 516:1959 and IS 456:2000 standards.

2. Scope

This SOP applies to all concrete cube sampling and testing activities carried out at construction sites, covering the entire process from sample collection to testing at 7, 14, and 28 days.

3. Responsibilities

QA/QC Engineer

Oversees the sampling and testing process and ensures compliance with quality standards

Lab Technician

Prepares, casts, and tests concrete cube specimens

Site Engineer

Coordinates concrete pours and facilitates sample collection

Document Controller

Maintains records of test results and prepares reports

4. Materials & Equipment

Cube Molds

Standard 150mm × 150mm × 150mm metal molds

Mold Oil

Release agent for easy demolding

Sampling Tools

Shovels, scoops, and containers for concrete sampling

Tamping Rod

16mm diameter, 600mm long steel rod

Rubber Mallet

For tapping mold sides during compaction

Finishing Tools

Trowels and floats for surface finishing

Curing Tank

Water tank with temperature control (27°C ± 2°C)

Compression Testing Machine

Calibrated machine capable of 3000 kN load

5. Procedure

1
Preparation Before Sampling
  • Prepare sampling plan according to the concrete pour schedule
  • Determine number of cubes required (minimum 3 cubes per test age)
  • Clean cube molds thoroughly and check for damage or deformation
  • Apply thin coating of mold oil to inner surfaces
  • Assemble molds ensuring all bolts are tightened securely
  • Verify all equipment is clean and ready for use
2
Concrete Sampling
  • Take samples at point of discharge for ready-mix concrete
  • For site-mixed concrete, sample from at least five different portions of the batch
  • Collect at least 1.5 times the volume needed for cube casting
  • Record batch details, time, location, and mix design information
  • Perform slump test on the same concrete sample
  • Transport sample to casting location immediately
3
Cube Casting
  • Place molds on level, rigid, non-absorbent surface
  • Fill molds in three equal layers (approximately 50mm each)
  • Compact each layer with 35 strokes of the tamping rod distributed uniformly
  • Tap sides of mold 10-15 times with rubber mallet after tamping each layer
  • After top layer compaction, strike off excess concrete using trowel
  • Smooth surface with minimum manipulation to achieve flat finish
  • Mark cubes with unique identification numbers and casting date
4
Initial Curing
  • Cover cast specimens with damp cloth or plastic sheet
  • Store at temperature of 27°C ± 2°C
  • Protect from vibration and jolting
  • Keep in molds for 24 ± 0.5 hours from time of addition of water to mix
  • Maintain specimens in a place free from vibration
5
Demolding
  • Remove cubes from molds carefully after 24 ± 0.5 hours
  • Use screwdriver or similar tool gently if needed to loosen sides
  • Avoid damaging edges or corners during demolding
  • Mark each cube with permanent identification (batch number, date, etc.)
  • Inspect cubes for defects (honeycombing, damaged edges)
  • Record any observed defects in the sample register
6
Standard Water Curing
  • Place demolded specimens in water curing tank immediately
  • Maintain water temperature at 27°C ± 2°C
  • Ensure complete immersion with at least 15cm water above specimens
  • Change water in curing tank every 7 days
  • Ensure cubes are not touching each other or sides of tank
  • Add lime (approximately 2g/liter) to prevent leaching of calcium
  • Keep specimens fully submerged until testing time
7
Specimen Handling for Testing
  • Remove specimens from curing tank at appropriate test age (7, 14, 28 days)
  • Wipe surface water and grit from specimens
  • Test within 2 hours of removal from curing tank
  • If testing is delayed, keep specimens covered with wet burlap or cloth
  • Measure and record dimensions of each cube before testing
  • Weigh each cube and record weight
8
Compression Testing
  • Check that testing machine is calibrated and functioning properly
  • Place cube centrally on the lower platen of testing machine
  • Ensure that load is applied to opposite cast faces of the cube
  • Apply load at rate of 140 kg/cm²/minute without shock
  • Record maximum load at which specimen fails
  • Note and document the type of failure pattern
  • Calculate compressive strength by dividing maximum load by cross-sectional area
9
Documentation & Reporting
  • Record all test results in designated format
  • Calculate average strength of specimens for each test age
  • Compare results with acceptance criteria as per IS 456:2000
  • Document any deviations from standard procedure
  • Prepare comprehensive test report with all relevant details
  • Submit results to site engineer and project manager

6. Quality Control

Verify mold dimensions match standard requirements (150mm × 150mm × 150mm)
Ensure consistent compaction method across all specimens
Maintain curing temperature within specified range (27°C ± 2°C)
Cross-check specimen identification markers before testing
Calibrate compression testing machine every 6 months
Validate test results by checking for abnormal failure patterns

7. Acceptance Criteria

7-Day Strength

Minimum 67% of specified 28-day characteristic strength

28-Day Strength

Should meet or exceed specified characteristic strength (fck)

Individual Variation

No individual result should be less than fck - 3 N/mm²

Group Criteria

Average of 4 consecutive test results ≥ fck + 0.825 × established standard deviation

8. Specimen Storage Requirements

Temperature Control

Maintain curing tank at 27°C ± 2°C with thermostatic control

Water Quality

Use clean, potable water free from contaminants

Identification System

Clear labeling system with batch details and testing dates

Protection

Guard against damage, vibration, and contamination

Record Keeping

Maintain log of environmental conditions and specimen details

Access Control

Restricted access to prevent unauthorized handling

9. Safety Precautions

Handle fresh concrete with rubber gloves to prevent skin irritation
Wear safety goggles when applying mold oil and handling chemicals
Use proper lifting techniques when handling cube specimens
Wear appropriate PPE during compression testing
Have eye wash station nearby when handling chemicals

10. Troubleshooting Common Issues

Low Strength Results

Check compaction technique, verify curing conditions, assess concrete mix proportions

Honeycombing in Cubes

Improve compaction, check for proper tamping, assess slump of concrete

Damaged Specimens

Improve demolding technique, handle with care, ensure proper initial curing

Irregular Failure Pattern

Check testing machine platens, ensure cube is centered, verify perpendicular faces

11. Professional Tips

Hot Weather Precautions

Shield specimens from direct sunlight, increase frequency of water level checking

Cold Weather Precautions

Use insulated curing tanks, monitor temperature more frequently

Consistent Sampling

Take samples from middle portion of batch, not from beginning or end

Test Planning

Cast extra cubes for high-risk concrete elements as backup specimens

12. Conclusion

Proper cube casting and curing is essential for accurate determination of concrete strength. Following this SOP ensures reliable and consistent test results that accurately represent the in-situ concrete quality. Always maintain proper documentation and adhere to the specified standard procedures for valid quality assurance.

13. References

IS 516:1959 - Method of Tests for Strength of Concrete
IS 456:2000 - Plain and Reinforced Concrete - Code of Practice
IS 1199:1959 - Methods of Sampling and Analysis of Concrete
Project Quality Assurance Plan