Painting Works Procedure 🎨
1. Purpose 🎯
To ensure high-quality, durable, and aesthetically pleasing paint finishes on interior and exterior surfaces while maintaining safety standards and compliance with specifications.
2. Scope 📌
Applicable for all painting works on concrete, brick, and plastered surfaces in residential, commercial, and industrial projects, including surface preparation, priming, and final coating.
3. Responsibilities 👷♂️
Site Supervisor
Ensures SOP adherence & quality checks
Quality Inspector
Verifies finish quality & compliance
Painters
Surface prep & paint application
Safety Officer
Ensures PPE compliance & safety
4. Materials & Tools 🛠️
Primer
Acrylic/Oil-based as required
Paints
Interior/Exterior emulsions
Tools
Brushes, Rollers, Sprayers
Measuring
Tape, Levels, Chalk lines
5. Procedure
Surface Preparation
- Remove dust, grease, and loose particles
- Fill cracks with cement putty
- Sand surfaces for smooth finish
- Mask non-painted areas
Primer Application
- Apply uniform primer coat
- Allow 6-8 hours drying time
- Inspect for missed spots
Painting Process
Interior Painting
- Apply 2 coats of emulsion
- Maintain 6hr drying between coats
Exterior Painting
- Use weather-resistant paint
- Apply with roller/spray gun
Finishing & Inspection
- Check for uniform finish
- Touch up defects
- Clean tools & remove masking
6. Quality Control ✅
Color Consistency
Check for uniform shade
Adhesion Test
No peeling on scratch test
Water Resistance
No absorption on exterior
Finish Quality
No brush marks/drips
7. Safety Measures ⚠️
Respiratory Protection
Use masks in enclosed areas
Fall Protection
Safety harness for heights
Fire Safety
No smoking near paints
Ventilation
Ensure airflow in interiors